Footpath Replacement Works - Stage 6

Share Footpath Replacement Works - Stage 6 on Facebook Share Footpath Replacement Works - Stage 6 on Twitter Share Footpath Replacement Works - Stage 6 on Linkedin Email Footpath Replacement Works - Stage 6 link

Consultation has concluded

The City of Burnside proposes to undertake footpath replacement works on your side of the street between March and May 2016. The existing footpath will be replaced with new concrete pavers.

Please see the stage 6 list of streets in the table below.

Please contact us if you are considering a new or changed driveway or if you have any enquiries or comments.

Proposed work

Footpath replacement works proposed on the streets below will involve the removal and replacement of the existing footpath/verge area with a new 1550mm wide brick paved footpath. The pavers are rectangular shaped in a claret colour.

During the works, the existing property stormwater pipes may be disconnected as excavations are undertaken to construct the footpath foundations. These pipes will be reconnected. Please refer to the Resident Information Guide in the Document Library to your right. It will provide more detail on how footpaths are installed.

Your existing gravel or hot mix driveway crossing will also be replaced. If you are considering a new or significantly changed driveway to coincide with these works or a new property stormwater pipe, an approval from Council is required and a section 221 application form can be obtained from www.burnside.sa.gov.au, the Document Library or the Council offices.

To assist with these works please cut back any vegetation on your property overhanging the boundary before any construction starts.

We value your feedback

Council wishes to consult with you on these proposed works.

Please complete the survey below by 5 pm Monday 15 February 2016 or send us an email should you have any questions.

If you wish to discuss in detail any changes to your driveway crossing, property stormwater pipe or footpath upgrade, please call Peter Broomhead on 8366 4191 or 0438 404 945 or email pbroomhead@burnside.sa.gov.au.

Council's paving contractor "Best Bricks and Pavers" will contact you five working days prior to commencing work in your street. This notice will include contact details for the works supervisor if you have any concerns during construction.

Stage 6 list of streets below:

The City of Burnside proposes to undertake footpath replacement works on your side of the street between March and May 2016. The existing footpath will be replaced with new concrete pavers.

Please see the stage 6 list of streets in the table below.

Please contact us if you are considering a new or changed driveway or if you have any enquiries or comments.

Proposed work

Footpath replacement works proposed on the streets below will involve the removal and replacement of the existing footpath/verge area with a new 1550mm wide brick paved footpath. The pavers are rectangular shaped in a claret colour.

During the works, the existing property stormwater pipes may be disconnected as excavations are undertaken to construct the footpath foundations. These pipes will be reconnected. Please refer to the Resident Information Guide in the Document Library to your right. It will provide more detail on how footpaths are installed.

Your existing gravel or hot mix driveway crossing will also be replaced. If you are considering a new or significantly changed driveway to coincide with these works or a new property stormwater pipe, an approval from Council is required and a section 221 application form can be obtained from www.burnside.sa.gov.au, the Document Library or the Council offices.

To assist with these works please cut back any vegetation on your property overhanging the boundary before any construction starts.

We value your feedback

Council wishes to consult with you on these proposed works.

Please complete the survey below by 5 pm Monday 15 February 2016 or send us an email should you have any questions.

If you wish to discuss in detail any changes to your driveway crossing, property stormwater pipe or footpath upgrade, please call Peter Broomhead on 8366 4191 or 0438 404 945 or email pbroomhead@burnside.sa.gov.au.

Council's paving contractor "Best Bricks and Pavers" will contact you five working days prior to commencing work in your street. This notice will include contact details for the works supervisor if you have any concerns during construction.

Stage 6 list of streets below:

Email Us - Stage 6

Consultation has concluded