The City of Burnside proposes to undertake footpath replacement works between July 2014 and June 2015 subject to Council adoption of the 2014/15 budget. We are currently consulting with residents in the following locations, and the respective timeframes, where it is proposed that the existing footpath will be replaced with new concrete pavers:
Beaumont:
West side of John Cleland Drive (12 May 2014 to 2 June 2014)
West side of Katoomba Road (12 May 2014 to 2 June 2014)
South side of West Terrace (27 May to 10 June 2014)
Burnside:
East side of Lockwood Road (27 May to 10 June 2014)
North side of Mcallan Avenue (29 May to 12 June 2014)
East side of Wyatt Road (29 May to 12 June 2014)
Erindale:
West side of Crossley Street (25 June to 9 July 2014)
South side of Egmont Terrace (25 June to 9 July 2014)
Frewville:
West side of Chessington Avenue (1 to 16 July 2014)
Glenunga:
West side of Cedar Avenue (1 to 16 July 2014)
North side of Cedar Avenue (16 to 31 July 2014)
Hazelwood Park:
South side of Kirkdale Avenue (1 to 16 July 2014)
North side of Lancelot Avenue (1 to 16 July 2014)
Kensington Gardens:
North side of Elford Street (12 May 2014 to 2 June 2014)
East side of Peroomba Avenue (27 May to 10 June 2014)
East side of West Terrace (27 May to 10 June 2014)
West side of White Avenue (29 May to 12 June 2014)
Kensington Park:
South side of Beulah Road (29 May to 12 June 2014)
North side of Borda Street (25 June to 9 July 2014)
West side of Corinda Avenue (25 June to 9 July 2014)
Tobruk Avenue (1 to 16 July 2014)
West side of Toowong Avenue (1 to 16 July 2014)
Magill:
East side of Carey Street (12 May to 2 June 2014)
East side of Briant Road (27 May to 10 June 2014)
North side of Chapel Street (29 May to 12 June 2014)
North side of Ellis Street (29 May to 12 June 2014)
East side of Rosedale Place (25 June to 9 July 2014)
North side of Rosedale Place (25 June to 9 July 2014)
Rosslyn Park
North side of Park Avenue (1 to 16 July 2014)
East side of Taylor Terrace (1 to 16 July 2014)
Tusmore:
East side of Burke Street (25 June to 9 July 2014)
South side of Bakewell Street (1 to 16 July 2014)
Please contact us if you are considering a new or changed driveway or if you have any enquiries or comments.
Proposed work
These works will involve the removal and replacement of the existing footpath/verge area with a new 1550mm wide brick paved footpath. The pavers are rectangular shaped in a claret/red colour.
During the works, the existing property stormwater pipes may be disconnected as excavations are undertaken to construct the footpath foundations. These pipes will be reconnected. The Resident Information Guide will provide more detail on how footpaths are installed.
Your existing gravel or hot mix driveway footpath crossing will also be replaced.If you are considering a new or significantly changed driveway to coincide with these works or a new property stormwater pipe, an approval from Council is required and Section 221 application form must be returned to Council.
To assist with these works please cut back any vegetation on your property overhanging the boundary before any construction starts.
If you wish to discuss in detail any changes to your driveway crossing, property stormwater pipe or footpath, please contact Andrew Strauss on 8366 4253 or 0438 404 945 or via the Email Us tab below.
Council’s paving contractor “Best Bricks and Pavers” will contact you 5 working days prior to commencing work in your street. This notice will include contact details for the works supervisor if you have any concerns during construction.
The City of Burnside proposes to undertake footpath replacement works between July 2014 and June 2015 subject to Council adoption of the 2014/15 budget. We are currently consulting with residents in the following locations, and the respective timeframes, where it is proposed that the existing footpath will be replaced with new concrete pavers:
Beaumont:
West side of John Cleland Drive (12 May 2014 to 2 June 2014)
West side of Katoomba Road (12 May 2014 to 2 June 2014)
South side of West Terrace (27 May to 10 June 2014)
Burnside:
East side of Lockwood Road (27 May to 10 June 2014)
North side of Mcallan Avenue (29 May to 12 June 2014)
East side of Wyatt Road (29 May to 12 June 2014)
Erindale:
West side of Crossley Street (25 June to 9 July 2014)
South side of Egmont Terrace (25 June to 9 July 2014)
Frewville:
West side of Chessington Avenue (1 to 16 July 2014)
Glenunga:
West side of Cedar Avenue (1 to 16 July 2014)
North side of Cedar Avenue (16 to 31 July 2014)
Hazelwood Park:
South side of Kirkdale Avenue (1 to 16 July 2014)
North side of Lancelot Avenue (1 to 16 July 2014)
Kensington Gardens:
North side of Elford Street (12 May 2014 to 2 June 2014)
East side of Peroomba Avenue (27 May to 10 June 2014)
East side of West Terrace (27 May to 10 June 2014)
West side of White Avenue (29 May to 12 June 2014)
Kensington Park:
South side of Beulah Road (29 May to 12 June 2014)
North side of Borda Street (25 June to 9 July 2014)
West side of Corinda Avenue (25 June to 9 July 2014)
Tobruk Avenue (1 to 16 July 2014)
West side of Toowong Avenue (1 to 16 July 2014)
Magill:
East side of Carey Street (12 May to 2 June 2014)
East side of Briant Road (27 May to 10 June 2014)
North side of Chapel Street (29 May to 12 June 2014)
North side of Ellis Street (29 May to 12 June 2014)
East side of Rosedale Place (25 June to 9 July 2014)
North side of Rosedale Place (25 June to 9 July 2014)
Rosslyn Park
North side of Park Avenue (1 to 16 July 2014)
East side of Taylor Terrace (1 to 16 July 2014)
Tusmore:
East side of Burke Street (25 June to 9 July 2014)
South side of Bakewell Street (1 to 16 July 2014)
Please contact us if you are considering a new or changed driveway or if you have any enquiries or comments.
Proposed work
These works will involve the removal and replacement of the existing footpath/verge area with a new 1550mm wide brick paved footpath. The pavers are rectangular shaped in a claret/red colour.
During the works, the existing property stormwater pipes may be disconnected as excavations are undertaken to construct the footpath foundations. These pipes will be reconnected. The Resident Information Guide will provide more detail on how footpaths are installed.
Your existing gravel or hot mix driveway footpath crossing will also be replaced.If you are considering a new or significantly changed driveway to coincide with these works or a new property stormwater pipe, an approval from Council is required and Section 221 application form must be returned to Council.
To assist with these works please cut back any vegetation on your property overhanging the boundary before any construction starts.
If you wish to discuss in detail any changes to your driveway crossing, property stormwater pipe or footpath, please contact Andrew Strauss on 8366 4253 or 0438 404 945 or via the Email Us tab below.
Council’s paving contractor “Best Bricks and Pavers” will contact you 5 working days prior to commencing work in your street. This notice will include contact details for the works supervisor if you have any concerns during construction.