Proposed nine month trial closure - Heatherbank Terrace, Stonyfell

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

Council seeks your opinion on an alternative traffic calming measure.

Background

In response to complaints about speeding in Heatherbank Terrace, the Council undertook traffic surveys which confirmed that traffic speeds were too high and intervention was warranted.

The Council then sought independent advice about the preferred traffic calming method to deal with the issue. Following consultation with residents of Heatherbank Terrace, a ‘Driveway Entry’ was installed in Heatherbank Terrace in June 2016.

As a result, the 85th percentile* traffic speed in Heatherbank Terrace reduced by 6 km/h from 62 km/h, prior to the installation of the Driveway Entry, to 56

Council seeks your opinion on an alternative traffic calming measure.

Background

In response to complaints about speeding in Heatherbank Terrace, the Council undertook traffic surveys which confirmed that traffic speeds were too high and intervention was warranted.

The Council then sought independent advice about the preferred traffic calming method to deal with the issue. Following consultation with residents of Heatherbank Terrace, a ‘Driveway Entry’ was installed in Heatherbank Terrace in June 2016.

As a result, the 85th percentile* traffic speed in Heatherbank Terrace reduced by 6 km/h from 62 km/h, prior to the installation of the Driveway Entry, to 56 km/h.

*The 85th percentile speed is the maximum speed that 85 per cent of motorists that are travelling at.

After the installation of the Driveway Entry, the Council received complaints from Stonyfell residents, and requests to remove the Driveway Entry.

Further community consultation was then undertaken as part of a review of the Driveway Entry in March 2017. As a result of this community feedback the Driveway Entry has now been removed and council seeks to install an alternative measure to reduce vehicle speeds on the Terrace.

General feedback from SAPOL is that speeding remains an ongoing issue in Heatherbank Terrace. Knowing that speeding is an issue, Council has a responsibility to consider ways to address this problem.

Further Information

One potential solution is to trial a full closure of Heatherbank Terrace for a nine month period.

A nine month period is chosen to allow for sufficient traffic data to be gathered about traffic movements during the trial; and for a further community consultation to be undertaken after six months of the trial commencement (if it proceeds) to determine if it should remain as a permanent closure.

If the community supports this trial solution, the proposed full closure will be installed on Heatherbank Terrace west of the intersection of Mingara Avenue. See below for diagram.

During the closure the residents of Mingara Avenue and Allendale Grove will likely experience increased traffic volumes.

Is there another option?

Yes. If a trial full closure of Heatherbank Terrace is not supported by the residents of Stonyfell, Council is also seeking feedback on a potential nine month half closure of Heatherbank Terrace.

If the community supports this option, the proposed half closure will be installed on Heatherbank Terrace west of the intersection of Mingara Avenue.

A half closure will allow through access for eastbound traffic only. Westbound traffic will need to travel via Mingara Avenue to Hallett Road. See below for diagram.

Below: Proposed full closure (click to enlarge)

No through access on Heatherbank Terrace at Mingara Avenue.

Click to enlarge

Below: Proposed half closure (click to enlarge)

Part road closed on Heatherbank Terrace east of Mingara Avenue.

Eastbound traffic Give Way at Mingara Avenue to proceed along Heatherbank Terrace to Penfold Road.

Westbound traffic via Mingara Avenue and Allendale Grove.

Click to enlarge

How do I have a say?

Council will consider all written submissions made on the proposal that are received by the Council before the Council meeting on 26 November 2017 but requests that any such submissions be provided to the Council by 5 pm Monday 6 November 2017.

To give us your feedback, complete the survey online below or email us your comments to burnside@burnside.sa.gov.au

I need more information

For more information contact Council's Principal Traffic Engineer, David Hayes on 8366 4200, or email burnside@burnside.sa.gov.au

What happens next?

The results of this consultation will provide valuable information to the Council Elected Member body to inform its decision-making on whether it should implement a trial closure. A report will be provided to Council at a meeting in November 2017.

Council will advise you of any future changes to the traffic conditions on Heatherbank Terrace.

Six months into the trial, if it proceeds, Council will contact the community to gain feedback on the performance of the closure. This feedback will be provided to Council to determine if the closure should become permanent.

Proposed nine month trial closure - Heatherbank Terrace

Consultation has concluded