The Tregenza Oval Playground engagement closed 26 August 2013. The vast majority of responses were in favour of the upgrade. The most popular landscape features and amenities were the seating and shade options. While the most popular play features were:

  • Swinging
  • Sliding
  • Climbing

A design was developed in response to the community feedback and the upgrade was completed in June 2014.
During the works, the swing and slide were upgraded, and mounds made with rubber soft fall were added to the playground to provide children with climbing and sensory experiences. Further interactive elements such as sound tubes and puzzle panels were assembled in order to ensure maximum play experiences in the small area.
Upgraded fencing, rubber surfacing and entry gates on two sides ensure a safe experience for everyone.


Share Update on Facebook Share Update on Twitter Share Update on Linkedin Email Update link

This consultation has concluded.

<span class="translation_missing" title="translation missing: en.projects.blog_posts.show.load_comment_text">Load Comment Text</span>