Grant Avenue / Gurney Road Intersection, Rose Park

Council consulted with the Rose Park community to develop a suburb Precinct Plan that outlines the actions that Council seeks to take to improve local transport safety, accessibility and liveability.The Precinct Plan can be seen in the Document Library. The past engagement history can be found by following the link in the Project Links section to the right of screen.

What we heard was the:

  • Existing risk of parked vehicles and cyclists clashing (i.e. door strikes).
  • Intersection is visually unappealing due to stobie poles and crash barrier.
  • 14 recorded crashes involving crashes on Grant Avenue.
  • One recorded collision with a pedestrian at the Rose Park Primary School crossing.
  • Highest speed in the precinct area (53.8 km/h).
  • High peak hour cut-through traffic (16.3 per cent).
  • Intersection has been highlighted for upgrades as part of the Burnside Bicycle Network Plans.
  • An existing bike route (Burnside Bikeway) is located on Grant Avenue and greater cyclist volumes are expected, likely including vulnerable users (i.e. school children).

The Grant Avenue / Gurney Road Intersection features in the Precinct Plan as a location to improve safety for cyclists and pedestrians, and the intersection is aesthetically unpleasing due to the Stobie Poles and crash barrier.

There are 2 potential streetscape upgrades that could be implemented.

Streetscape options

  Option 1: Redesigned roundabout by adding pedestrian refuges at Grant Avenue and Gurney Road.

  Option 2: Raised intersection with new pedestrian crossings.

 

 

 

 

 

 

 

 

Next steps

Council will consider all community feedback from this survey along with up-to-date traffic survey data to finalise the concept design and where appropriate, undertake detailed design.

From there, Council will consider allocating budget for implementing changes as part of its Annual Business Plan and Budget.